|
|
WDMES Picture Gallery 18
Rebuilding the Track
At last we have our new club hut, or perhaps we should say:
Pavilion. It looks very nice, but still needs painting,
floor covering, net curtains....
Click on any of the photos to view a larger image.
|
3rd August, 2011
The new hut is finally here.
|
|
Another view of the new hut
|
|
|
Interior of the new hut.
|
|
Another interior shot, showing the view out over the
steaming bays and track. Yes, those are double-glazed
windows!
|
|
|
Work proceeds apace down the back straight. We are now
past the half-way mark.
|
|
14th September, 2011
The new pavilion has been treated with preservative, stained
Forest Green, had an industrial-strength floor covering installed,
had a veranda, with balustrades, built on to link it to the
steaming bays.
Oh, and the 5" track is now complete (apart from a few minor
adjustments to please the perfectionists), the 3.5" is more than
half-way done, and we have had at least one loco go round the
track!
|
|
Back to start of gallery...
|