Home
Club Diary
Portable Track Events
Picture Gallery
Membership
Club Rules
Contact us
External Events
Members pages

WDMES Picture Gallery 18

Rebuilding the Track

At last we have our new club hut, or perhaps we should say: Pavilion. It looks very nice, but still needs painting, floor covering, net curtains....

Click on any of the photos to view a larger image.

3rd August, 2011

The new hut is finally here.

Another view of the new hut

Interior of the new hut.

Another interior shot, showing the view out over the steaming bays and track. Yes, those are double-glazed windows!

Work proceeds apace down the back straight. We are now past the half-way mark.

14th September, 2011

The new pavilion has been treated with preservative, stained Forest Green, had an industrial-strength floor covering installed, had a veranda, with balustrades, built on to link it to the steaming bays.

Oh, and the 5" track is now complete (apart from a few minor adjustments to please the perfectionists), the 3.5" is more than half-way done, and we have had at least one loco go round the track!

Back to start of gallery...


Page created by Bill Purvis, Last update: September 16th, 2011

You are visitor number 744